Sunday, October 6, 2019

Coming Soon To A Place Near You

Jubilation–A Gargantuan Task

This is the second largest quilt I have ever made. The only larger one is the bed spread/quilt I made for our king size bed.
It started out to be 108 inches square and after quilting ended up 104 inches square.

image
Quilting a quilt this size on a domestic sewing machine is a major challenge.
Quilting this one was MORE than a major challenge.
I had planned free motion quilting for the curvy lines on the background.
I had machine trouble doing that so the entire quilt had to be done with the presser foot down, stopping and turning each time the lines changed direction.
I had less than two weeks to quilt and finish this quilt in my spare time.  I made it in time.
The pieced sections were made with a variety of solid commercial fabrics. They were cut with a special triangle shape ruler which was new at that time.
I sketched the design of the quilt but couldn’t complete it as I had no source for fabric that shaded from light to dark gray. When I learned more about dyeing fabric I created the grey fabric.

Saturday, October 5, 2019

What's Happening On Day 26

The accent tiles are ready to begin installing them. Can't wait for them to appear on the walls.
Bye Bye green walls. Hello temporary white walls. Just the base coat for the new faux painted walls coming soon.

Friday, October 4, 2019

Day 25 - Shower is winding down



Although it looks like there is little to do in the shower what is left is detail work that requires precision and takes time.
The floor tile was grouted today.
The project is on the home stretch.

Thursday, October 3, 2019

Day 24 - We have doors, drawers and more

I am so pleased with the door, drawers and the entire vanity. Can't wait for the counter top!
The wall tile is heading to the finish line, but there are a lot of detail  areas to do now.
I am really getting excited about getting this done and using it.

Wednesday, October 2, 2019

Day 23 - We're Heading On Up To The Topside!

Today the wall base tiles were finished and the wall tile moved farther up the wall. Space was left for the accent tile. 

Tuesday, October 1, 2019

Look What Day 22 Brought!

The vanity is happening. More to come!

Monday, September 30, 2019

Sunday, September 29, 2019

Warm Up Piecing Top

You may remember I was doing some warm up sewing of strips together.
This is the top I pieced with one set of strips.
Poor photo and not pressed yet.

Saturday, September 28, 2019

Day 19 Progess Being Made

The niche is ready for tile and trim. Walls are ready for more tile.

Thursday, September 26, 2019

Day 17. New wallboard

The new walls were started today.
Another new wall
More tile finished today



Wednesday, September 25, 2019

Day 16 - Time For Tile

-
It is starting to look like a shower now that the tile is being applied to the walls.

Tuesday, September 24, 2019

Day 15 - Another Day, Another Coat Or Two

It takes time to do things right so the shower will be waterproof. 

Monday, September 23, 2019

We Are Two Week Into Our Remodel

As of today we are 2 week into the remodel. This coat is a cheery cherry color!

Saturday, September 21, 2019

Day 12 The Walls Are Being Readied For The Tile

I am getting excited as it won't be too long before we start to see the tile on the walls.
The contractor is doing a great job getting the various experts here to do the work.

Friday, September 20, 2019

What Happened On Day11?

The shower is happening, although it is a complex time consuming process.

Thursday, September 19, 2019

10 days Into Our Remodel

It was necessary to patch a small area. Fortunately we had some tiles left from the original build and the tile installer was able to salvage a few more.

Friday, September 13, 2019

On To Day 5!



This is where the new shower will go.
They are doing a great job and making progress.